รายละเอียดของเดต้าเซ็นเตอร์ HKG1
Building Information
202,000 sq ft
DC Description
Tier IV-ready with full infrastructure redundancy design
UPS Systems
2N UPS configuration with 15 minutes of battery backup time
Generators
16 – 2,000 kVA transformers in 2N design
12 – Diesel Generators in 2+1 resiliency design
Security
24×7 security officers
Multiple CCTV cameras (interior and exterior)
Emergency Protection
VESDA / FM200 fire suppression
VPLS’ Hong Kong data center allows us to deliver extremely reliable and low latency service to our customers in China and Southeast Asia as the second largest cable landing station for all east-west traffic behind Singapore. VPLS’ partnership with PCCW at their Tier IV purpose built, 202,000 square foot facility in Hong Kong allows for large expansion and seamless network connectivity back to mainland China in this carrier neutral facility.
อุปกรณ์ / การสำรองไฟและเครื่องกำเนิดไฟฟ้า
- 16 – 2,000 kVA transformers in 2N design
- 12 – Diesel Generators in 2+1 resiliency design
- 14 kPa uniformly distributed load floor rating
- 2N UPS configuration with 15 minutes of battery backup time
- On-site diesel tanks support 12 hours at full capacity
การป้องกันและความปลอดภัย
- 24×7 security officers
- Access control using proximity card readers & biometrics
- Multiple CCTV cameras (interior and exterior)
- VESDA / FM200 fire suppression
Data Center Area
Total gross floor area: 266,000 sq ft
- Stage 1 (3/F-10/F, 15/F) gross floor area: 166,000 sq ft. 2500+ racks capacity
- Stage 2 (11/F-14/F) gross floor area: 72,600 sq ft. 1300+ racks capacity
Raised floor
- 600mm raised floor height
- 600mm x 600mm panel size
Headroom
- 4.87m slab to slab
- 4.3m slab to beam
Floor loading
- 14 kPa uniformly distributed load
Telecoms facilities
- 2 meet-me rooms per floor
- Dual risers with network diversity
- Carrier neutral
Amenities
- 2 passenger and 4 cargo lifts
- Loading bays on ground floor
- Parking on a shared basis
- Dry pantry & rest area
- Conference room (by reservation)
- Cloud video conferencing service
- Business Resumption Center
Cooling Systems
MVAC
- CRAC units in N+1 Configuration
- Supply air temperature control
- Ambient temperature: 18° C – 24° C
- Humidity: 35% – 70%
- Entire cooling system backend up by diesel generators
Protection systems
Security system
- Two-factor door access control (proximity card reader & biometric)
- 24/7 CCTV surveillance with local & remote monitoring
- 24/7 onsite security officers
Electricity
Utility supply
- Stage 1: 16 x 2,000 kVA trasformers
- Stage 2: 8 x 2,000 kVA transformers
- 2N design transformer
- Power supply from dedicated transformers for UPS and cooling equipment
- Dual main power sub-stations
UPS
- 2N configuration
- At least 15-minute battery backup time
- N String of batteries
Diesel generator
- Stage 1: 12 generators range from 2,000 kVA to 2,250 kVA in 2+1 resilience design
- Stage 2: 5 x 2,250 kVA generators in 4+1 resilience desing
Oil tank
- Minimum of 12 hours’ generator fuel storage
- Refueling takes place within 2 hours to ensure continuous generator operation
Detection Systems
Building management systems (BMS) – local and remote 24/7 status monitoring for:
- Chiller plant
- Power supply system
- Room temperature & humidirty
- Water leakage detection
- Access control
- CCTV
Fire detection/suppression system
- FM200 fire suppression system in data center & facility areas
- Very Early Smoke Detection Apparatus (VESDA)
- CO2 fire extinguishers installed in key areas
- Thermometer, hygrometer & smoke detector in data center areas
- Fire alarm with direct connection to local fire service stations