HKG – Hong Kong

รายละเอียดของเดต้าเซ็นเตอร์ HKG1

Building Information

202,000 sq ft

DC Description

Tier IV-ready with full infrastructure redundancy design

UPS Systems

2N UPS configuration with 15 minutes of battery backup time

Generators

16 – 2,000 kVA transformers in 2N design
12 – Diesel Generators in 2+1 resiliency design

Security

24×7 security officers
Multiple CCTV cameras (interior and exterior)

Emergency Protection

VESDA / FM200 fire suppression

VPLS’ Hong Kong data center allows us to deliver extremely reliable and low latency service to our customers in China and Southeast Asia as the second largest cable landing station for all east-west traffic behind Singapore. VPLS’ partnership with PCCW at their Tier IV purpose built, 202,000 square foot facility in Hong Kong allows for large expansion and seamless network connectivity back to mainland China in this carrier neutral facility.

อุปกรณ์ / การสำรองไฟและเครื่องกำเนิดไฟฟ้า

  • 16 – 2,000 kVA transformers in 2N design
  • 12 – Diesel Generators in 2+1 resiliency design
  • 14 kPa uniformly distributed load floor rating
  • 2N UPS configuration with 15 minutes of battery backup time
  • On-site diesel tanks support 12 hours at full capacity

การป้องกันและความปลอดภัย

  • 24×7 security officers
  • Access control using proximity card readers & biometrics
  • Multiple CCTV cameras (interior and exterior)
  • VESDA / FM200 fire suppression

Data Center Area

Total gross floor area: 266,000 sq ft

  • Stage 1 (3/F-10/F, 15/F) gross floor area: 166,000 sq ft. 2500+ racks capacity
  • Stage 2 (11/F-14/F) gross floor area: 72,600 sq ft. 1300+ racks capacity

Raised floor

  • 600mm raised floor height
  • 600mm x 600mm panel size

Headroom

  • 4.87m slab to slab
  • 4.3m slab to beam

Floor loading

  • 14 kPa uniformly distributed load

Telecoms facilities

  • 2 meet-me rooms per floor
  • Dual risers with network diversity
  • Carrier neutral

Amenities

  • 2 passenger and 4 cargo lifts
  • Loading bays on ground floor
  • Parking on a shared basis
  • Dry pantry & rest area
  • Conference room (by reservation)
  • Cloud video conferencing service
  • Business Resumption Center

Cooling Systems

MVAC

  • CRAC units in N+1 Configuration
  • Supply air temperature control
  • Ambient temperature: 18° C – 24° C
  • Humidity: 35% – 70%
  • Entire cooling system backend up by diesel generators

Protection systems

Security system

  • Two-factor door access control (proximity card reader & biometric)
  • 24/7 CCTV surveillance with local & remote monitoring
  • 24/7 onsite security officers

Electricity

Utility supply

  • Stage 1: 16 x 2,000 kVA trasformers
  • Stage 2: 8 x 2,000 kVA transformers
  • 2N design transformer
  • Power supply from dedicated transformers for UPS and cooling equipment
  • Dual main power sub-stations

UPS

  • 2N configuration
  • At least 15-minute battery backup time
  • N String of batteries

Diesel generator

  • Stage 1: 12 generators range from 2,000 kVA to 2,250 kVA in 2+1 resilience design
  • Stage 2: 5 x 2,250 kVA generators in 4+1 resilience desing

Oil tank

  • Minimum of 12 hours’ generator fuel storage
  • Refueling takes place within 2 hours to ensure continuous generator operation

Detection Systems

Building management systems (BMS) – local and remote 24/7 status monitoring for:

  • Chiller plant
  • Power supply system
  • Room temperature & humidirty
  • Water leakage detection
  • Access control
  • CCTV

Fire detection/suppression system

  • FM200 fire suppression system in data center & facility areas
  • Very Early Smoke Detection Apparatus (VESDA)
  • CO2 fire extinguishers installed in key areas
  • Thermometer, hygrometer & smoke detector in data center areas
  • Fire alarm with direct connection to local fire service stations